摘要
针对机械式穴播器装配线上在制品(Work In Process,WIP)主要依靠管理人员经验进行定性控制的问题,采用多点控制的方法对装配线上在制品进行定量优化。首先运用约束理论(Theory Of Constraint,TOC)结合推、拉两种生产方式对装配线进行分段研究,在分段节点设立瓶颈缓冲区、并联缓冲区和风险缓冲区;然后根据工位故障持续时间与物料消耗速度计算出缓冲区最优容量,得出机械式穴播器装配线在制品多点控制优化方案。通过对某企业机械式穴播器装配系统进行Flex Sim仿真,验证了方案的可行性。
A multi-node control scheme was proposed to optimize the Work In Process (WIP)on mechanical dibbler assembly line. Theory Of Constraint(TOC) was combined with the production modes of push and pull to divide assembly line into segments first. Next, bottleneck buffer,parallel buffer and risk buffer were seted up in the subsection node. Then calculated the optimal ca- pacity of the buffer according to the duration of the station failure and the material consumption rate, obtained the optimization scheme of multi-node control of WIP in mechanical dibbler assembly line. Finally, FlexSim was used to simulate the mechanical dibbler assembly system of an enterprise, verified the feasibility of the scheme.
作者
程小川
李成松
宋海草
曹卫彬
马信春
Cheng Xiaochuan;Li Chengsong;Song Haicao;Cao Weibin;Ma Xinchun(Mechanical and Electrical Engineering College,Shihezi University,Shihezi 832000,Xinjiang,Chin)
出处
《现代制造工程》
CSCD
北大核心
2018年第8期5-10,19,共7页
Modern Manufacturing Engineering
基金
国家自然科学基金项目(51445015)
关键词
机械式穴播器
装配线
在制品
约束理论
多点控制
mechanical dibbler
assembly line
Work In Process (WIP)
Theory Of Constraint ( TOC )
multi-node control