水电站扩机工程进水口围堰拆除设计与施工——赞比亚卡里巴北岸水电站扩机项目

Design and Construction of Dismantlement of Intake Cofferdam in Extension Project of Hydropower Station:Zambia Kariba North Shore Hydropower Expansion Project
下载PDF
导出
摘要 赞:赞比亚卡里巴北岸水电站始运营于1976年,扩机工程进水口围堰与老进水口的最近距离只有60m,与大坝的最近距离只有180m,围堰拆除是整个工程中的重大难点。在特大水库库容、深厚覆盖层以及深水位的情况下,对围堰进行了成功的爆破拆除,为类似工程提供了借鉴和参考。 The North Shore hydropower station in Kariba, Zambia was operated in 1976. The closest distance between the inlet cofferdam and the old intake of the expansion project is only 60 m. The closest distance to the dam is only 180 m. The demolition of the cofferdam is a major difficulty in the entire project. In the case of large reservoir capacity, deep overburden and deep water level, successful demolition of the cofferdam has provided reference for similar projects.
作者 姬学军 刘元广 JI Xue-jun, LIU Yuan-guang(Sinohydro Bureau 11 Co., Ltd., Zhengzhou 450000, Chin)
出处 《价值工程》 2018年第26期178-180,共3页 Value Engineering
关键词 围堰 拆除 成功 cofferdam demolition success
  • 相关文献

参考文献5

二级参考文献20

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部