期刊文献+

高铁箱梁架设施工技术的相关分析 被引量:2

Analysis on Construction Technology of High-speed Rail Box Girder
下载PDF
导出
摘要 高速铁路专线中的桥梁工程占据的铁路总长度比重非常大,而且高速铁路对于桥梁的承载强度要求较高,这就需要施工单位选择最为适合的施工技术来进行桥梁结构建设。而从以往施工经验来看,有效应用箱梁架设施工技术是非常必要的,能够建成高质量的高铁箱梁结构。基于此,本文将结合案例,着重分析和探讨如何有效应用高铁箱梁架设施工技术。 The proportion of the total length of railway occupied by the bridge project in the high-speed railway line is very large, and the high-speed railway requires high bearing strength of the bridge. This requires the construction unit to choose the most suitable construction technology for the construction of the bridge structure. From the previous construction experience, the effective application of box girder construction technology is very necessary to build a high-quality high-speed box girder structure. Based on this, this article will combine the case, focus on analysis and discussion on how to effectively apply high-speed box girder construction technology.
作者 刘凯 LIU Kai(China Railway No.9 Group Road and Bridge Company, Shenyang 110035, Chin)
出处 《价值工程》 2018年第27期259-260,共2页 Value Engineering
关键词 高铁 箱梁架设 施工作业 high-speed rail box girder erection construction work
  • 相关文献

参考文献2

二级参考文献10

共引文献25

同被引文献21

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部