高卸荷槽技术在100 m高冷却塔爆破拆除中的应用 被引量:3

Application of High Unloading Tank Technique in Blasting Demolition of 100 m High Cooling Tower
下载PDF
导出
摘要 以陈塘热电有限公司冷却塔爆破拆除为工程背景,探讨了高卸荷槽技术在爆破拆除冷却塔时的作用。通过精细化施工和科学管理,对冷却塔结构中26对人字支柱实施了钻孔爆破,同时在冷却塔周围开挖减振沟,最终达到了有效控制爆破振动速度的目的。通过将理论振动速度和实测振动速度进行对比,得出理论振动速度为实测振动速度的4.3倍,可见在爆破拆除冷却塔时,采用高卸荷槽技术能够有效降低触地振动速度。 Taking the blasting demolition of the cooling tower of Chentang Thermal Power Co. , Ltd. as engineering background, the effects of high unloading tank technique in blasitng demolition of cooling tower is discussed. Through meticulous construction and scientific management, the drilling blas- ting implementation of the 26 herringbone pillars of the cooling tower structm- is done, at the same time, the vibration damping ditches are excavated around the the cooling tower. Through comparasion of theoret- ical vibration speed and acutal measured vibration speed, it is show that the former is 4.3 times higher than the later, which further indicated that during the process of blasting demolition of cooling tower, the touchdown vibration speed can be decreased significantly by adopting high unloading tank technique.
作者 边作青 张纪云 高帅杰 刘玉华 赵玉龙 董保立 张英才 Bian Zuoqing;Zhang Jiyun;Gao Shuaijie;Liu Yuhua;Zhao Yulong;Dong Baoli;Zhang Yingcai(Public Security Detachment of Chifeng Public Security Bureau in Inner Mongolia;Henan Xunda Blasting Co.,Ltd.;Public Security Corps,Department of Public Security of Henan Province;College of Civil Engineering,Henan Polytechnic University)
出处 《现代矿业》 CAS 2018年第7期197-199,共3页 Modern Mining
关键词 高卸荷槽技术 爆破拆除 薄壁冷却塔 精细化施工 安全防护 High unloading tank technique Blasting demolition Thin-walled cooling tower Meticu- lous construction Safety protection
  • 相关文献

参考文献5

二级参考文献48

共引文献272

同被引文献23

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部