针对台山CEPR核电机组总体仪控试验中降级运行试验后机组状态恢复问题,通过理论研究与创新,研究制定了一套适用于CEPR机组的状态恢复策略和风险控制方法,并成功协助CEPR机组完成所有降级运行试验后的机组状态恢复。
Considering the problem of Taishan CEPR nuclear power plant state restoration after degrade mode test in Overall IC test, one theoretical analysis and research was performed. One set of CEPR plant state restoration methods and risk control means were formulated, and which have successfully helped CEPR plant to restore plant state after all of which degrade mode tests.
作者
李永进
宋玉亮
陈信仁
史长青
刘东亮
LI Yong-jin;SONG Yu-liang;CHEN Xin-ren;SHI Chang-qing;LIU Dong-liang(China Nuclear Power Engineering Co.,Shenzhen Guangdong 518124,China)
出处
《科技视界》
2018年第17期1-3,65,共4页
Science & Technology Vision