地下管线群跨越地铁隧道的压载补偿预制管沟结构施工技术 被引量:1

Structure Construction Technology of Ballast Compensation Precast Concrete Trench for Underground Pipe Lines Crossing Metro Tunnel
下载PDF
导出
摘要 针对市政地下管线群跨越地铁隧道时可能引起隧道结构变形问题,设计了一种预制管沟结构。管沟结构由U型槽、底板与盖板组成。该结构利用盖板上方的砂袋压载来补偿土方开挖造成的卸荷,可实现施工期间的基本零卸荷,从而控制下方地铁隧道的隆起变形,以确保地下管线施工期间的地铁运营安全。工程实践表明,该管沟结构尤其适用于软土地区,能有效控制土体卸荷引起的地铁隧道隆起变形。 In line with the deformation of metro tunnel structure when large amount of underground pipe lines cross over the tunnel,a precast concrete pipe trench structure is designed.It consists of U-shaped trench,base plate and cover plate,and uses the sand bag ballast on top of the cover plate to make up the loss of earth stress due to the excavation above metro tunnel,so as to achieve the goal of zero unloading during the construction,and control metro tunnel upheaval effectively for metro daily safe operation. The practical construction show s that this technology of precast concrete trench is especially applicable to soft clay area,and could control metro tunnel upheaval effectively caused by the unloading of soil.
作者 王鑫 周竝 金国龙 林靖 WANG Xin;ZHOU Bing;JIN Guolong;LIN Jing(The 9th China Ship Ninth Design Research Institute Engineering Co.,Ltd.,200063,Shanghai,Chin)
出处 《城市轨道交通研究》 北大核心 2018年第8期120-124,共5页 Urban Mass Transit
关键词 地下管线施工 管沟结构 地铁隧道保护 underground pipe line construction trench structure protection of metro tunnel
  • 相关文献

二级参考文献10

共引文献36

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部