露天煤矿用地周期的理论计算与保障措施

Theoretical calculation and guarantee measures of open-pit mine land time cycle
下载PDF
导出
摘要 露天矿山用地改革为快速生产提供了保障,但矿床覆存条件、开采工艺参数等的不同,要完成采、运、排、复垦环节的时间不同,即用地周期的长短不一致。建立了用地周期理论计算模型,以平朔矿区典型近水平生产露天矿为例,理论计算出用地周期并对不同构造对周期的影响进行分析,提出保障措施和办法。 Land reform in open-pit mine provides guarantee for rapid production. The different deposit conditions, mining process parameters and other factors lead to different time of mining, transportation, waste dump and land reclamation, which lead to the length of the land use cycle inconsistent. This article establishes the theory calculation model of land use cycle. Taking the typical nearly horizontal deposit conditions in Pingshuo Open-pit Mine as an example, the article calculates land use cycle in theory and analyzes the effect of land use cycle on different deposit conditions, and puts forward the measures and methods of guarantee.
作者 贺昌斌 常永刚 许昌 张加权 邓有燃 陈德付 李海潮 原文杰 HE Changbin;CHANG Yonggang;XU Chang;ZHANG Jiaquan;DENG Youran;CHEN Defu;LI Haichao;YUAN Wenjie(Antaibao Open-pit Mine,China Coal Pingshuo Group Co.,Ltd.,Shuozhou 036006,China;Anjiding Open-pit Mine,China Coal Pingshuo Group Co.,Ltd.,Shuozhou 036006,China;Changzhi Supervision Bureau,Shanxi Coal Mine Safety Supervision Bureau,Changzhi 046011,China;0pen-pit Engineering Services Company,PingShuo Industrial Group Co.,Ltd.,Shuozhou 036006,China)
出处 《露天采矿技术》 CAS 2018年第4期4-7,共4页 Opencast Mining Technology
关键词 临时用地 露天煤矿 用地周期 地质构造 保障措施 temporary land open-pit mine land cycle geological structure guarantee measure
  • 相关文献

参考文献4

二级参考文献14

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部