摘要 重庆东环铁路柿子坪隧道进口不稳定边坡为一处松散堆积体,处于欠稳定-不稳定状态,一旦滑动,将严重威胁柿子坪隧道的安全,影响东环铁路施工。在治理不稳定堆积体的过程中,采用堆积体后缘减载、堆积体下部设置抗滑桩、堆积体外侧设置环形截水沟,引排地表水等综合治理措施,有效地增加了堆积体的稳定性。 The unstable slope at Shiziping Tunnel, Chongqing East Central Railway, is a threat to tunnel security and the construction of Chongqing East Central Railway, due to its deficiency in stability. Comprehensive treatment of slope instability includes load shedding at the trailing edge, slide-resistance pile at the bottom, annular intercepting ditch at the outside of the slope, drainage of surface water, etc. , which effectively increase the stability of the deposit.
作者 杨小刚 YANG Xiaogang(Chongqing Survey, Design and Research Institute Co. , Ltd. of CREEC, Chongqing 400023, China)
出处 《路基工程》 2018年第4期258-262,共5页 Subgrade Engineering
关键词 隧道洞口堆积体 滑坡 抗滑桩 减载 综合治理 deposit at the tunnel entrance; landslide; slide-resistance pile; load shedding; comprehensive treatment
  • 相关文献

参考文献2

二级参考文献9

共引文献6

同被引文献8

引证文献1

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部