期刊文献+

同泽大桥拉索横梁成桥阶段静力分析 被引量:1

Static Analysis for Cross Diaphragm of Tongze Brideg in Finished Stage
下载PDF
导出
摘要 斜拉桥拉索横梁除承受多个方向的荷载作用以外,还需传递斜拉索拉力,其剪力传递路径非常复杂。以同泽大桥工程为背景,采用MIDAS/FEA有限元分析软件建立拉索横梁模型,对拉索横梁成桥阶段的受力特性进行分析,重点研究了拉索横梁横向受力特性,探究其拉应力产生的原因。 In addition to bearing the loads in multiple directions,the cross diaphragm of cable-stayed bridge has to transfer the stress of stay cables. The transfer path of shear forces is complicated. This paper takes the engineering of Tongze bridge as an example,analyzing the mechanical behavior of cross diaphragm in finished stage.The Tongze bridge is a kind of prestressed concrete cable-stayed bridge with single arched and inclined tower. The model of cross diaphragm is established by the finite element analysis software Midas/FEA. This paper focuses on the mechanical behavior of transverse tension stress of cross diaphragm,and explores the causes.
作者 辛明奇 陈建荣 贾金青 XIN Ming-qi;CHEN Jian-rong;JIA JIN-qing(Faculty of hffrastructure Engineering,Dalian University of Techonlogy,Dalian 116033,China;Liaoning Provincal Communication Planning and Design Institute Co.,Ltd.,Shenyang 110166,China)
出处 《北方交通》 2018年第7期25-29,共5页 Northern Communications
关键词 MIDAS/FEA 拉索横梁 横向拉应力 成桥状态 MIDAS/FEA Cross diaphragm Crosswise tensile stress Finished stage
  • 相关文献

参考文献7

二级参考文献28

共引文献19

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部