摘要
随着沿海地区城市的不断发展,可用地的不断缩减,城市发展最终将向临海、填海发展,如何有效地加固沿海地区填海区域的淤泥层,是沿海地区及类似区域的工程施工技术难题。结合在珠海横琴应来科创广场项目所涉及的加固处理及施工控制进行了总结和研究。
With the continuous development of cities in the coastal areas,the constant reduction of availability,the development of the city will eventually develop to the sea and fill the sea. How to effectively reinforce the silt layer in the reclamation area of the coastal areas,become a technical difficulties of engineering construction in coastal areas and similar areas. This article combines reinforcement and construction control to the Kechuan Plaza project involved in square section a summarized and studied in Zhuhai Hengqin.
作者
缪玺
MIAO Xi(China Railway sixteen Bureau Luqiao Engineering Co.,Ltd.,Beijing Miyun 101500 China)
关键词
塑料排水板
真空堆载
饱和软基
施工技术
plastic drain board
vacuum loading
saturated soft foundation
construction technology