塔式起重机基础不均匀沉降的原因分析及应对措施 被引量:1

Cause Analysis and Countermeasures for Differential Settlement of Tower Crane Foundation
下载PDF
导出
摘要 上海市崇明区18-2期03A地块为大型商务区,其中2~#、3~#塔式起重机基础在建筑施工过程中出现了不同程度的沉降。针对此特殊情况,对产生不均匀沉降的原因进行分析,并采取了针对性的应对措施,最终改善了不均匀沉降的情况,使塔机得以正常运作,为施工现场提供了安全保障。 The 18-2 Phase 03A Plot in Shanghai Chongming District is a large-scale business district, in which the 2# and 3# tower crane foundations have different degrees of settlement during the building construction process. Aiming at this special situation, the causes of differential settlement were analyzed and the targeted countermeasures were taken. In the end, the differential settlement was improved, so that the tower crane can operate normally and provide safety guarantee for the construction site.
作者 杜小平 DU Xiaoping(Shanghai Greenland Architecture Engineering Co.,Ltd.,Shanghai 200232,China)
出处 《建筑施工》 2018年第8期1290-1291,1294,共3页 Building Construction
关键词 塔式起重机 不均匀沉降 原因分析 基础加固 tower crane differential settlement cause analysis foundation reinforcement
  • 相关文献

参考文献1

二级参考文献2

共引文献2

同被引文献9

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部