摘要
焦化厂通过脱硫工艺流程串联改造,创造了在原基础上优化焦炉煤气脱硫工艺的新流程,解决了脱硫系统存在的各项问题,脱硫后的焦炉煤气用于焦炉和加热炉,燃烧完全达到环保新标准要求。
Through serial upgrading of desulphurization processes in the coking plant, the new process optimizing the coke oven gas desulfurization technology was created on the basis of the original process, and then the various problems existing in the desulfurization system were solved, and the coke oven gas after desulfurization was used in coke ovens and reheating furnaces, its combustion could completely reach the standard of new environmental protection requirements.
作者
曹毅
蒋淑艳
Cao Yi;Jiang Shuyan(The Coking Plan)
出处
《莱钢科技》
2018年第2期16-19,共4页
Laigang Science & Technology
关键词
焦炉煤气
脱硫
两塔串联
coke oven gas
desulfurization
two towers in series