摘要
介绍了6 m焦炉结焦时间延长后的炉温控制及操作管理要求,并对相关问题进行探讨,制定相关应对措施,减少焦炉结焦时间延长对炉体造成的影响。
In the paper, the furnace temperature control and operation management requirements after prolonging the coking time of 6m coke oven were introduced, and the related problems were discussed, the relevant countermeasures were formulated, and then the influence of prolonging the coking time on the furnace body was reduced,
作者
高希迎
杜彧
Gao Xiying;Du Yv(The Coking Plant;The Metallurgical Design Institute of Shandong Province)
出处
《莱钢科技》
2018年第2期53-55,共3页
Laigang Science & Technology
关键词
焦炉
结焦时间
延长
coke oven
coking time
extension