摘要
针对季节性冻土区浅埋地下水条件下渠道反复冻胀破坏的问题,提出了套砌方法改造渠底及坡脚的加固方案,并运用数值模拟软件COMSOL对改造加固前后渠道抗冻胀和融沉效果进行模拟,对比分析了渠道改造加固前后位移场和应力场变化情况。
In view of the serious problem of repeated frost heave in the channel under the condition of shallow buried groundwater in seasonal frozen soil area, the reinforcement scheme for rebuilding the bottom of the canal and the foot of the slope is proposed, and the numerical simulation software COMSOL is used to simulate the effect of frost heave and thawing before and after the reconstruction and reinforcement, and the strengthening and strengthening of the channel before and after the reconstruction and reinforcement are compared and analyzed. The change of displacement field and stress field.
作者
李斌
LI Bin(Fukang City Jiuyun Street Town Agriculture(Animal Husbandry)Development Service Center,Fukang 831501,China)
出处
《水科学与工程技术》
2018年第4期49-51,共3页
Water Sciences and Engineering Technology
关键词
季节性冻土
渠道
块石换填
防冻胀
效果模拟
seasonal frozen soil
channel
stone fill replacement
frost heave prevention
effect simulation