摘要
文章结合都安至武鸣公路工程红渡红水河大桥施工实例,介绍了连续刚构桥边跨现浇段贝雷支架法设计与施工技术,并通过贝雷支架受力验算,验证了该桥贝雷支架法施工的合理性。
Combining the construction practices of Hongdu Hongshui River Bridge in Duan-Wuming Highway project,this article introduced the design and construction technology of Bailey stent method for side-span cast-in-situ section of continuous rigid frame bridge,and verified the construction rationality of this bridge by Bailey stent method through the force checking of Barley stent.
作者
李世艺
LI Shi-yi(Guangxi Road Construction Engineering Group Co., Ltd., Nanning, Guangxi, 53000)
出处
《西部交通科技》
2018年第5期109-112,共4页
Western China Communications Science & Technology
关键词
边跨现浇段
贝雷支架
验算
预压
Side-span cast-i n-situ section
Bailey stent
Checking
Pre-compression