摘要
根据西河矿区3201工作面概况,提出并分析了分层分步探放水工程设计及其应用,探讨了水害治理措施,为以后有效解决掘进任务与探放水工作提供新方法。
Based on the general situation of 3201 working face in Xihe mining area, this paper put forward and analyzed the design and application of stratified and step-by-step water exploration and discharge project and discussed the measures against water damage, which pro-vided a new method for effectively finishing excavation task and solving water exploration and discharge in future.
作者
王国军
WANG Guojun(Yangcheng Xihe Coal Industry Co.,Ltd.,Shanxi Coal Transportation and Sale Group,Jincheng 048106,Shanxi,China)
出处
《能源与节能》
2018年第8期127-128,共2页
Energy and Energy Conservation
关键词
探放水
保安煤柱
老空区积水
分步探放
water exploration and discharge
security coal pillar
old goaf ponding
step-by-step exploration and discharge