期刊文献+

岩体质量分级的风险分析方法 被引量:5

A RISK ANALYSIS METHOD IN ROCK MASS QUALITY CLASSIFICATION
下载PDF
导出
摘要 提出了基于RMR岩体质量分级系统的岩体质量研究风险分析方法。该方法分析步骤如下 :(1)通过岩芯样品的现场观测和实验室试验获得分类所需的变量 ;(2 )统计分析拟合得出各变量的分布函数及参数 ;(3)运用Monte Carlo模拟方法获得 2万个RMR值 ,并将结果绘成岩体质量描述图 ;(4)利用以上结果作出岩体质量风险分析评价。 A risk analysis method based on Bieniawski's RMR system was proposed. Firstly, variables which were acquired for the RMR classification system were obtained from field and laboratory investigation of the core samples . Secondly, distribution functions and parameters of all variables are determined using statistic method. Thirdly, 20000 RMR values have been obtained utilizing Monte Carlo method and the results are plotted . Finally, risk analysis can be made from above results. This method acquire good results in applied to the research on quality of rock masses in Runyang Yangze River Highway Bridge Project .
出处 《工程地质学报》 CSCD 2002年第3期331-336,共6页 Journal of Engineering Geology
关键词 岩体质量分级 风险分析方法 岩体质量描述图 MONTE-CARLO模拟 统计分析 Rock mass classification system,Risk analysis method,Rock mass quality description chart,Monte Carlo simulation.
  • 相关文献

参考文献4

二级参考文献29

  • 1罗国煜,阎长虹.岩坡系统分析与可靠性评价[J].地质学报,1994,68(2):185-196. 被引量:18
  • 2王联魁,张绍立,徐文新,梁跃龙,邓高强,沙连堃.太平洋东西两岸花岗岩的相似性[J].地质学报,1995,69(1):42-55. 被引量:5
  • 3徐卫亚 等.长江三峡工程工程地质力学研究[M].北京:中国三峡出版社,1997..
  • 4徐卫亚 许兵.工程岩体质量评价研究.工程地质力学进展[M].北京:地震出版社,1994..
  • 5韩德福.简介Q系统、RMR岩体分级方法及在地下洞室围岩分级中的具体应用[J].水利水电工程地质情报网网刊,1987,:23-46.
  • 6杜时贵,地质科技情报,1997年,2期,91页
  • 7陈剑平,随机不连续面三维网络计算机模拟原理,1995年,175页
  • 8Boadu E K,Int J Rock Mech Min Sci Geomech Abstr,1994年,31卷,127页
  • 9周庆良,公路,1994年,18页
  • 10秦四清,非线性工程地质学导引,1993年,5页

共引文献71

同被引文献33

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部