期刊文献+

大型斜拉桥超高塔控制测量技术设计与实践 被引量:10

Design and Application of Super High Tower Control Measurement Technology for Large Cable-Stayed Bridge
下载PDF
导出
摘要 以在建的武汉四环线青山长江大桥为例,针对大型斜拉桥超高塔复杂结构高精度控制测量特点,按照绝对控制与相对控制分阶段测量的思路,系统研究了斜拉桥超高塔平面工作基准点竖向传递的主要测量方法及误差大小,最终确定"全站仪天顶测量+全站仪短距极坐标测量"为超高塔锚固件定位测量方案。工程应用表明,该方案满足施工精度要求,对其他类似工程有重要参考价值。 Taking the on-going Qingshan Yangtze River Bridge as the example which is a large cable-stayed bridge with super-high pylons and complex structure requiring hi-precision controlling survey,main survey methods and error range related to the vertical transfer measurement of super-high pylon plane datum points are studied systematically in the paper,according to the principle of absolute control and relative control measurement in various stages. Finally,the proposal of total station zenith measurement and total station polar coordinate measurement for short distance is determined as the measurement plan of the anchoring parts location. The application shows that the plan can meet the requirements of construction precision and provide important reference for other similar projects.
作者 肖根旺 朱顺生 王晓智 XIAO Genwang;ZHU Shunsheng;WANG Xiaozhi(China Railway Major Bridge Engirwering Group Co.Ltd,Wuhan 430050,Chin)
出处 《测绘科学技术学报》 CSCD 北大核心 2018年第2期201-205,共5页 Journal of Geomatics Science and Technology
关键词 斜拉桥超高塔 锚固件定位 绝对控制测量 相对控制测量 全站仪 竖向传递测量 super high touter of cable-stayed bridge anchoring parts location absolute control measurement relative control measurement total station vertical transter measurement
  • 相关文献

参考文献3

二级参考文献18

共引文献26

同被引文献50

引证文献10

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部