期刊文献+

基于MS60的BIM施工放样精度研究 被引量:3

Study on Precision of BIM Construction Setting out Based on MS60
下载PDF
导出
摘要 众所周知,在复杂建筑施工中,采用传统的全站仪施工放样,存在操作困难、精度受限及放样效率低等问题。该文结合中国五冶项目重庆仙桃国际数据谷异形建筑放样的数据,首先通过Revit软件处理BIM模型,借助徕卡MS60测量机器人进行BIM放样;然后结合传统方法对放样精度进行了对比分析。结果显示,BIM施工放样的精度更高,而且操作更简单、效率更高。 As iswell known, in the complex construction, the traditional overall station construction setting out has problems such as difficult operation,limited precision and low efficiency of setting out.In this paper, according to the data from Chongqing Xiantao Bigdata Valley on special-shapedbuilding of China MCC5 Group Corp.LTDproject in Chongqing, the BIM model was first processed by Revit software, and the BIM was sampled by the Leica MS60 measurement robot. Then, the precision of the setting out was compared and analyzed with the traditional method. The results show that the precision of BIM construction setting out is higher, and the operation is simpler and more efficient.
出处 《重庆建筑》 2018年第8期34-37,共4页 Chongqing Architecture
基金 重庆市自然科学项目基金(cstc2014jcyj A30013) 山区桥梁与隧道工程国家重点实验室资助(CQSLBFZ16-19)论文之一
关键词 施工放样 BIM REVIT MS60测量机器人 construction setting out BIM Revit MS60 measuring robot
  • 相关文献

参考文献8

二级参考文献28

共引文献102

同被引文献15

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部