摘要
在分析潍烟铁路线路走向、功能定位的基础上,结合龙口市的发展规划,对潍烟铁路经龙口市站车场布置方案研究,提出站房对侧新建高速车场方案、站房北侧新建高速车场方案和占压龙烟车场新建高速车场方案,结合运营组织、既有设施利用和以人为本、着眼发展的理念,通过工程经济比较和优缺点分析,推荐站房对侧新建高速车场方案。
With the line direction and the function orientation of Weiyan railway and the city development and planning of Longkou,this paper had studied the station layout of Longkou railway station,and proposed three schemes,new railway station on the opposite side,new railway station on the north side and the new railway station on the Longyan station. Through engineering economy comparison and analysis of advantages and disadvantages,considering operational organization,existing facilities,the idea of human-oriented and focusing on development,this paper recommend the scheme of new railway station on the opposite side.
作者
杜朝敏
Du Chaomin(China Railway Design Corporation,Tianjin 300142,China)
出处
《山西建筑》
2018年第17期19-20,共2页
Shanxi Architecture
关键词
潍烟铁路
龙口市站
车场布置
Weiyan railway
Longkou station
station layout