内缩层附着爬升施工技术分析

Analysis on construction technology of adhesion and climbing of inner shrinkage layer
下载PDF
导出
摘要 结合某实际工程案例,阐述了某工程内缩层全钢爬架附着爬升的施工方法,通过在内缩层位置安装钢立柱转换系统,把通常安装在楼板上的附着支座及吊挂件转移到钢立柱上,顺利实现了在内缩楼层钢爬架的爬升施工,该工法确保了施工安全、节约了工期、降低了施工成本,可为类似工程提供借鉴。 Combined with a practical engineering case,the construction method of the climbing and climbing of all steel climbing frames in a project is expounded. By setting up the steel column conversion system in the inner shrinkage layer,the attached support and hanger which is usually set on the floor are transferred to the steel column,and the climbing construction of the steel climbing frame of the inner shrinkage floor is successfully realized. The construction method ensures construction safety,saves time and saves construction cost,which can provide reference for similar projects.
作者 赵斌源 Zhao Binyuan(Shanxi Guangxin Real Estate,Taiyuan 030001,China)
出处 《山西建筑》 2018年第17期103-105,共3页 Shanxi Architecture
关键词 内缩楼层 全钢爬架 钢立柱 retracted floor all steel climbing frame steel column
  • 相关文献

参考文献2

二级参考文献8

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部