摘要
针对支模、绑扎梁肋钢筋和预埋管线、运输、吊装、安装、调校、绑扎板面钢筋、浇筑等方面,结合一期工程现场存在的三个问题,主要介绍对内置芯模现浇空心楼盖施工的技术控制措施,从而更好的指导二期工程项目施工。
For shuttering,tie beam ribbed bars and the embedded pipe,transportation,hoisting,installation,calibration and colligation steel plate,casting the eight aspects,combined with the problems of three phase of the field,this paper mainly introduces the internal core modules of the cast-in-place hollow floor construction technology control measures,so as to better guide the construction of phase Ⅱ project.
作者
屈建军
Qu Jianjun(Hubei Xinde Construction Co.,Ltd,Yichang 443100,China)
出处
《山西建筑》
2018年第17期105-106,共2页
Shanxi Architecture
关键词
芯模
粉砂岩
施工技术
core module
silt stone
construction technology