为满足"十三五"期武汉至安庆6 m水深航道建设要求,开展多因素限制下武安段鲤鱼山水道6 m水深航道治理措施研究。通过该水道近期6 m水深航道条件分析,明晰河段6 m水深下航道的问题,并探讨浅滩治理思路,提出单纯技术因素下河段治理思路和措施;针对单纯技术因素下工程措施与鲤鱼山水道众多涉水建筑物存在矛盾的问题,通过模型试验提出多限制条件下鲤鱼山水道6 m水深航道治理措施。
To meet the requirement of 6 m waterway from Wuhan to Anqing in the period of the 13 th FiveYear Plan, we study the regulation measures for the 6 m deep waterway of Liyushan, Wu'an section under the restriction of multiple factors.Analyzing the current condition of the 6 m deep waterway,we clarify the problems of the waterway and probe into the shoal regulation idea and measures simply under technical factors. To counter the contradiction between the engineering measures simply under technical factors and watertight buildings,we propose the regulation measures for the 6 m deep waterway of Liyushan channel under multiple restrictions based on the model test.
作者
朱玉德
刘鹏飞
ZHU Yu-de;LIU Peng-fei(Key Laboratory of Engineering Sediment of Ministry of Transport,Tianjin Research Institute of Water Transport Engineering,Tianjin 300456,Chin)
出处
《水运工程》
北大核心
2018年第7期114-118,164,共6页
Port & Waterway Engineering
基金
国家重点研发计划项目(2016YFC0402106)
关键词
航道整治
治理措施
限制
waterway regulation
regulation measure