文中对某大型互通立交已施工桩柱利用方案进行了介绍,并对各方案采用有限元软件进行动力分析,并验证了各方案的受力合理性。同时,对各方案从施工难度、耐久性、经济性等多方面进行比选,最终推荐了一个合理的既有桩柱利用方案,为同类项目提供借鉴。
In this paper, the utilization scheme of piles and piers used in a large-scale interchange has been introduced, and the dynamic analysis of each program has been carried out using finite element software to verify the rational distribution of force of each scheme. At the same time, various programs were selected from the aspects of construction difficulty, durability, economical efficiency, etc. Finally, a reasonable existing pile and pier utilization program was recommended to provide reference for similar projects.
作者
盛捷
SHENG Jie(Guangdong Province Communications Planning & Design Institute Co. Ltd., Guanzhou 510507,China)
出处
《广东交通职业技术学院学报》
2018年第3期71-75,共5页
Journal of Guangdong Communication Polytechnic
关键词
独柱墩
既有桩柱利用
动力分析
有限元
single pier
existing piles and piers utilization
dynamic analysis
finite element