期刊文献+

某综合楼建设全过程投资控制措施 被引量:1

Investment Control Measures in the Whole Process of Construction of a Comprehensive Building
下载PDF
导出
摘要 通过某综合楼全过程建设,总结工程项目建设中的投资控制事例,得出一些心得体会,有如下措施:领导重视、科学决策,选择优秀设计团队、竞选设计方案,开展工程招投标,控制主材的采购,加强施工管理,办好竣工结算手续,同时重视人才,给大家提供一些借鉴。 Through the construction of a comprehensive building,summarize the examples of investment control in the construction of pro- jects and draw- some insights. There are the following measures:leadership attention,scientific decision-making,selection of a good design team, campaign design, project bidding, and master control the procurement of materials, strengthening of construction management, completion of settle- ment procedures, and paying attention to the construction of a talented team, provide some reference for everyone.
作者 王坚 Wang Jian(Guangdong Construction Engineering Group Co.,Ltd. Guangzhou 510030,China)
出处 《广东土木与建筑》 2018年第6期76-78,共3页 Guangdong Architecture Civil Engineering
关键词 建设全过程 投资控制 措施 the whole process of construction investment control measures
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部