2Baabak A,et al.A shuffled frog-leaping model for solving time-cost- resource optimization(TC R O) problems in construction project planning[J].Journal of Computing in Civil Engineering,2013(4): 1-39.
3Ashuri B.Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve TCRO problems in construction project planning[J].Journal of Construction Engineering and Management,2012(9): 1065-1074.