期刊文献+

地铁盾构隧道无端墙密闭钢套筒接收技术研究 被引量:4

Study on Receiving Technology of Closed Steel Bushing for Metro Tunnel Shield without End Wall
下载PDF
导出
摘要 地铁盾构隧道施工中由于盾构到达时接收端主体结构未施工或盾构出洞端头未进行加固导致盾构无法接收的情况。采用钢套筒密闭结构施工工艺有效解决上述情况带来的风险。以地铁区间为实例,在借鉴以往经验的基础上,在接收端未施工二衬结构的情形下,对盾构钢套筒接收[1]进行研究,考虑防水及其密闭性,为相关地铁盾构隧道施工提供了指导和借鉴。 The situation that the shield is unable to receive the shield in the construction of the shield tunnel,because the main structure of the receiving end of the shield is not constructed or the end of the shield is not strengthened. The construction technology of steel sleeve closed structure can effectively solve the risks brought by the above situation. Taking the subway interval as an example,on the basis of the previous experience, the receiving of the shield steel sleeve is studied under the condition that the structure is not constructed at the receiving end. The water proof and its tightness are considered, which provide guidance and reference for the construction of the related subway shield tunnel.
作者 陈树茂 方一航 袁梦 魏晨亮 何列 Chen Shumao;Fang Yihang;Yuan Meng;Wei Chengliang;He Lie(Guangzhou Metro Group Co.,Ltd.Guangzhou 510308,China;China Railway Tunnel Stock Co.,Ltd.Guanagzhou 510635,China)
出处 《广东土木与建筑》 2018年第7期39-42,共4页 Guangdong Architecture Civil Engineering
关键词 无端墙 盾构隧道 钢套筒接收 sideless shield tunnel steel sleeve receiving
  • 相关文献

参考文献6

二级参考文献18

共引文献103

同被引文献21

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部