采用支撑梁体系作为支护结构的深基坑,在土方开挖到底层遇到较硬的强风化中风化岩层时,传统施工方法如机械凿岩、明爆法和静爆法等施工效果均不理想。多支撑体系深基坑底层硬岩开挖技术在广州某市政项目深基坑施工中成功实施并取得了良好的效果,可供类似工程借鉴参考。
When the supporting beam system is used as the supporting structure in the deep foundation pit,the traditional construction methods,such as mechanical rock drilling,blasting method and static blasting,are not ideal in the strong weatherting medium weatherting hard rock strata in the earth excavation. The hard rock excavation technology of deep foundation pit bottom layer of multi-support system has been successfully implemented in the construction of deep foundation pit of a municipal project in Guangzhou,which can be used for reference for similar projects.
作者
黄超
Huang Chao(Guangzhou Jishi Construction Group Co.,Ltd.Guangzhou 510725,China)
出处
《广东土木与建筑》
2018年第7期86-88,共3页
Guangdong Architecture Civil Engineering
关键词
深基坑
土方开挖
硬岩
支撑
凿岩
deep foundation pit
earth excavation
hard rock
support