摘要 针对目前煤矿大型断层治理中存在的问题,提出了采用地面注浆方法对断层进行加固的方案。根据新集二矿地质条件及F10断层含、导水情况,对注浆压力、注浆量、浆液扩散半径等注浆参数进行了计算。根据石门过F10断层的布置方案,对钻孔布置进行设计。即采用直孔加水平孔方式,对断层进行注浆加固,取得预期效果。 According to the problems existed in the large fault treatment of the present coal mines,the grouting method at the surface ground was provided and applied to the reinforcement plan of the fault.According to the geological condition of Xinji No.2 Mine as well as the F10 fault and water flow condition,a calculation was conducted on the grouting pressure,grouting volume,grout diffusion radius and other grouting parameters.According to the layout plan of the cross-cut passed through the F10 fault,a design was conducted on the borehole drilling layout.The straight borehole plus the horizontal borehole were applied to the grouting and reinforcement of the fault and the expected effect was obtained.
作者 李竟超 LI Jingchao(SDIC Xinji Anhui Design and Research Institute Company Limited,Huainan 232001,China)
出处 《建井技术》 2018年第2期19-21,共3页 Mine Construction Technology
关键词 大型断层 地面注浆 注浆参数 分支孔 large fault grouting at surface ground grouting parameters branch borehole
  • 相关文献

参考文献6

二级参考文献36

  • 1李涛,李文平,高颖,乔伟.杨庄矿6煤底板深部岩溶裂隙水体特征研究[J].采矿与安全工程学报,2010,27(1):94-99. 被引量:14
  • 2白建业,贺可强.高阳铁矿矿床突水的防治[J].金属矿山,2005,34(7):23-26. 被引量:5
  • 3国家煤炭工业局.建筑物、水体、铁路及主要井巷煤柱留设及压煤开采规程[M].北京:煤炭工业出版衬,2000.
  • 4GB50384-2007,煤矿立井井筒及硐室设计规范[S].
  • 5GB 50215-2005,煤炭工业矿井设计规范[S].
  • 6MT/T1124-2011,煤矿冻结法开凿立井工程技术规范[S].
  • 7邓维国,申建红.西部地区煤矿建井期间存在问题的探讨[J].山东科技大学学报:自然科学版,2010,29(S) : 160-165.
  • 8魏学敬,赵相泽.定向钻井技术与作业指南[M].北京:石油工业出版社.2012-05:288-301.
  • 9中铁建第四勘察设计院.神华集团新街台阁庙斜井TBM施工图设计[R],2012.
  • 10华盛水文地质勘探公司.神华集团新街台阁庙地勘报告[R],2012.