期刊文献+

采用BIM技术进行建筑给水排水优化设计 被引量:5

Optimization of Construction Water Supply and Drainage Design by BIM Technology
下载PDF
导出
摘要 通过应用BIM技术,可以将建筑给排水设计者的思想构成相关的模型,更全面地考虑影响给排水设计各方面的因素,辅助完善建筑给排水的设计过程,促进建筑给排水各项规划,丰富了建筑给排水设计的方法,提升了给排水系统的设计水平和建筑质量。同时,应用模糊综合评价法分析了建筑给排水设计过程中实施BIM技术的优势,有利于实现设计与施工过程的数据共享,且用户可参与仿真设计过程,最大限度地满足个性化需求。因此,BIM技术应用前景广阔,有必要在建筑给排水设计中推广应用。 Through the application of BIM technology,the idea of water supply and drainage designers can be turned into the models,which would cousider various influencing factors to affect water supply and drainage design more comprehensively. BIM technology assist in improving construction of water supply and drainage planning,the design level and building quality. At the same time,the fuzzy comprehensive evaluation method is applied to analyze the advantages of implementing BIM technology in the water supply and drainage design process. It facilitates the sharing of data in the design and construction process,and users can participate in the simulation design process to meet the individual needs.
作者 魏天云 Wei Tianyun(Department of Road Engineering, Fujian Chuanzheng Communications College, Fuzhou, Fujian 350007, China)
出处 《黑龙江工业学院学报(综合版)》 2018年第7期72-75,共4页 Journal of Heilongjiang University of Technology(Comprehensive Edition)
基金 福建省教育厅科技项目(编号:JA15655)资助
关键词 BIM技术 建筑 给排水 数据共享 仿真设计 BIM technology building : water supply and drainage sharing of data simulation design
  • 相关文献

参考文献7

二级参考文献43

  • 1谢宜.基于BIM的北京路及周边地区城市规划微环境模拟[J].土木建筑工程信息技术,2011,3(2):63-68. 被引量:4
  • 2过俊.BIM在国内建筑全生命周期的典型应用[J].建筑技艺,2011(1):95-99. 被引量:141
  • 3秦军.建筑设计阶段的BIM应用[J].建筑技艺,2011(1):160-163. 被引量:57
  • 4徐浩,梁广伟,耿跃云.BIM技术在世博文化中心项目中的应用.建筑技艺,2010,(Z1):215-218.
  • 5赵源煌.中国建筑业BIM发展的阻碍因素及对策方案研究[D].北京:清华大学,2011.
  • 6YESSIOS C I. Are We Forgetting Design[ EB/OL] (2004. 10 )ht- tp ://www. aecbytes, com/viewpoint/2004/issuel0, html.
  • 7LAISERIN J. Comparing Pommes and Naranjas[ EB/OL]. (2002) http : www. Laiserin. corn/.
  • 8PAUL Teicholz. Labor Productivity Declines in the Construction Industry: Causes and Remedies[ DB/OL] (2004 -04 - 14) [2013 -07 - 10 ]. http://www, aecbytes, com/viewpoint/2004/issue_ 4. html.
  • 9GUO H L, LI H, SKITMORE M. Life Cycle Management of Construction Projects Based on Virtual Prototyping technology [ J]. Journal of Management in Engineering,2010, 26( 1 ) :41 - 47.
  • 10LI H, GUO H L,SKIBNIEWSKI M J, SKITMOREM. Using the IKEA Model and Virtual Prototyping Technology to Improve Con- struction Processmanagement [ J ]. Construction Management and Economics, 2008, 26(9) :991 - 1000.

共引文献184

同被引文献39

引证文献5

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部