不同市场条件下金属露天矿分期方案动态优化

Dynamic Optimization of the Staging Scheme of Open-Pit Metal Mines in Different Market Conditions
下载PDF
导出
摘要 基于浮锥排除法基本原理以及动态规划法进行露天矿分期方案动态优化.采用2 000万t矿量作为境界增量,使用锥体排除法产生一系列地质最优候选境界,以净现值最大为目标函数,对候选境界序列进行动态规划,得出不同市场价格条件下的最优分期方案.研究结果表明,当价格平均年增长率分别为1.5%,3%,4.5%,其所对应的生产成本年增长率分别为0.5%,1%,2%时,给出的最佳方案为分两期开采方案和分三期开采方案,其中分两期开采方案比分三期开采方案产生的经济净现值分别多1.2%,3%,4.3%;但分两期开采方案比分三期开采方案采出的矿石量分别少9.2%,7.9%,13.1%.由此可见,以净现值或者矿石资源量作为生产决策指标对最优分期方案的选取有很重要的影响. Based on the theory of floating cone exclusive and dynamic programming method,dynamic optimization of the staging scheme was used in open-pit mines. The optimal installment scheme could be obtained under the conditions of the different iron ore market by using 20 million tons of ore quantity as boundary increment to produce a series of geological optimal candidate boundaries by using cone elimination,and dynamic programming for the maximum of the net present value. The results showed that when the average price growth rate are 1. 5%,3% and4. 5%,and the corresponding annual growth rate of production costs are 0. 5%,1% and 2%,the best scheme is divided into two stages and three stages. The economic net present value of the two stages of mining scheme is 1. 2%,3% and 4. 3% more than that of the three stage mining scheme,but the amount of ore is 9. 2%,7. 9%,and 13. 1% less than that of three stage mining scheme. It can be seen that the net present value or the amount of mineral resources has a very important influence on the selection of the optimal scheme.
作者 王青 田维西 顾晓薇 秦宗琛 WANG Qing;TIAN Wei-xi;GU Xiao-wei;QIN Zong-chen(School of Resources & Civil Engineering,Northeastern University,Shenyang 110819,China.)
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 2018年第7期1044-1047,1064,共5页 Journal of Northeastern University(Natural Science)
基金 国家自然科学基金资助项目(51674062 51474049) 国家自然科学基金青年基金资助项目(51604061) 中央高校基本科研业务费专项资金资助项目(N160104009)
关键词 露天矿 分期开采 地质最优序列 动态规划 最优分期方案 open-pit mine phase mining geological optimal sequence dynamic programming the optimal staging scheme
  • 相关文献

参考文献4

二级参考文献28

  • 1管仁荣,张德会,陈其慎.中国铁矿石需求分析[J].中国矿业,2011,20(S1):28-31. 被引量:9
  • 2Lemieux M J. Moving cone optimizing algorithm [ A]. The Computer Method for the 80's in the Mineral Industry [ C]. Weiss A. New York: AIME, 1979:329-345.
  • 3Lerchs H, Grossmann I F. Optimum design of open-pit mines [J]. CIM Bull, 1965, 58:47 -54.
  • 4Korobov S. Method for determining optimum open-pit limits [ R]. Technica] Report EP74 -R -4, Montreal: Ecole Polytechnique, 1974.
  • 5Dowd P A, Onur A H. Open-pit optimization-part 1: optimal open-pit design [J]. Trans. Instn. Min. Metall. (Sect. A: Min. Industry), 1993, 102: A95-A104.
  • 6Zhao Y, Kim Y C. A new optimum pit limit design algorithm [A]. Proc. 23rd Symposium on the Application of Computers and Operations Research in the Mineral Industry (APCOM) [ C]. Littleton, Colo. AIME, 1992:423 -434.
  • 7Yegulalp T M , Arias A J, Muduli P, et al. New development in ultimate pit limit problem solution method [ J ]. Transactions, 1993, 294:1 851 -1 855.
  • 8Gershon M E. An open-pit production scheduler: algorithm and implementation [J]. Min. Engng. , 1987, 39:793 -796.
  • 9Fytas K, Calder P N. A computerized model of open-pit short and long range production scheduling [A]. Proc. 19th APCOM [C]. New York: AIME, 1986:109-119.
  • 10Wright E A. Dynamic programming in open-pit mining sequencing, a case study [A]. Proc. 21th APCOM [ C]. 1989: 415 -421.