基于BIM技术施工进度计划管理应用研究 被引量:7

Research on construction schedule management based on BIM technology
下载PDF
导出
摘要 基于BIM技术的施工进度计划管理,可利用模型三维可视化的特点模拟施工,且模拟过程不消耗施工资源,有效结合现场人、材、机的使用情况,做到进度计划的提前制定、及时调整与合理安排,实现返工成本和管理成本的降低,同时也可降低风险,增强管理者对施工过程的控制能力。论述了基于广联达BIM5D施工进度计划管理的应用流程、建模方法、数据输入要求、BIM应用成果、关键步骤、注意事项及成功经验。 Construction schedule management based on BIM technology permits simulating construction by use of the visual characteristic of 3 D model, without consumption of construction resources and effectively combining with the field situation of person, materials and machines; drafting plan in advance and adjusting schedule in time; reducing rework cost and management cost we well as risk; is able to enhance the manager's ability to control the construction progress. An introduction was made on the application of construction schedule management based on Glodon-BIM5 D including the application process, modeling method, data input requirements, the results of BIM application, key steps, issues in need of special attention and successful experience.
作者 赵治超 谢一玲 ZHAO Zhi-chao;XIE Yi-ling(Guangxi Polytechnic of Construction,Nanning 530000,China)
出处 《广西水利水电》 2018年第3期67-70,共4页 Guangxi Water Resources & Hydropower Engineering
基金 基于BIM技术的建设工程管理专业教学改革研究与实践(2017年度广西职业教育教学改革研究项目(GXHZJ2017B10))
关键词 广联达BIM5D 进度计划管理 施工模拟 三维模型 Glodon-BIM5D schedule management construction simulation three-dimensional (3D) model
  • 相关文献

参考文献3

二级参考文献17

共引文献46

同被引文献32

引证文献7

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部