掘进工作面机械设备快速安装工序优化 被引量:4

The Optimization of the Rapid Installation of Mechanical Equipment in the Driving Face
下载PDF
导出
摘要 掘进工作面机械设备种类较多,在安装过程中若安装施工不当,不仅降低安装效率,而且机械设备在后期的使用中易出现故障,影响掘进工作面安全高效施工。西山煤电集团马兰矿通过技术研究,对28301皮带巷掘进期间机械设备安装提出合理有效的快速安装施工工艺,确保设备高效稳定运转。 The mechanical equipment of tunneling faces is various. If correct installation method is not taken during the installation process, it not only reduces the efficiency of equipment installation, but the use of mechanical equipment in the later process is also easy to fail, affecting the safe and efficient construction of heading face. Malan Mine, Xishan Coal and Electricity Group, after many technical researches, put forward reasonable effective fast installation construction technology for the installation of machinery equipment in 28301 belt roadway during excavating, ensuring the equipment to run efficiently and stably.
作者 安石磊 An Shi-lei(Malan Mine, Xishan Coal and Electricity Group, Gujiao Shanxi 03020)
出处 《山东煤炭科技》 2018年第6期46-47,52,共3页 Shandong Coal Science and Technology
关键词 掘进 设备 安装 tunneling equipment installation
  • 相关文献

参考文献5

二级参考文献4

共引文献63

同被引文献10

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部