摘要
针对一期尿素凉水塔1号风机机组振动大的问题,根据历年运行状况和检修记录,对可能引起振动大的原因进行深入探究、分析,采用排除法找出引起风机异常振动的直接原因,并介绍了处理方法和预防措施。
In view of the problem of large vibration of the No.1 fan unit of the urea cooling tower in the first phase,according to the operation status over the years and the maintenance records,the cause of the vibration may be deeply investigated and analyzed,and the direct cause of the abnormal vibration of the fan is found by the elimination method.,and introduced treatment methods and preventive measures.
出处
《化工设计通讯》
CAS
2018年第7期113-113,共1页
Chemical Engineering Design Communications
关键词
振动
风机
测量
间隙
vibration
fan
measurement
clearance