介绍了某水电站工程概况及坝址区地质条件,结合规范要求对大坝左岸溢流坝段设计进行计算分析,并对溢流坝的稳定性进行论证,对其它类似工程设计和建设具有参考意义。
This paper introduces the general situation of a hydropower station project and the geological conditions of the dam site area, calculates and analyzes the design of the spillway section on the left bank of the dam in accordance with the requirements of the code, and demonstrates the stability of the spillway dam, which is of reference significance for the design and construction of other similar projects.
出处
《科技创新与应用》
2018年第22期94-95,97,共3页
Technology Innovation and Application
关键词
溢流坝
结构设计
抗滑稳定性
应力
overflow dam
structural design
anti-slide stability
stress