期刊文献+

1400 MW等级核电汽轮机低压末级隔板疏水槽和疏水孔的制造技术研究

Research on Manufacturing Technology of Drain Tank and Drainage Hole in LP Last Stage Diaphragm for 1400 MW Nuclear Turbine
下载PDF
导出
摘要 文章分析了1 400 MW等级核电汽轮机低压末级隔板汽道的疏水槽和疏水孔的结构特点、技术要求及制造难点,制定有效的制造策略及方法,为后续核电隔板的疏水孔和疏水槽的加工提供了经验和参考。 In the paper, the structure characteristics, technological requirements and manufacturing difficulties of drain tank and drainage hole in LP last stage diaphragm for 1 400 MW nuclear Turbine are analyzed, and the corresponding effective manufacturing strategies and methods are formed which provide experience and reference for the processing of the drain tank and drainage hole in following nuclear diaphragm project.
作者 李西 彭刚 Li Xi, Peng Gang(Dongfang Turbine Co., Ltd., Deyang Sichuan, 61800)
出处 《东方汽轮机》 2018年第2期49-52,58,共5页 Dongfang Turbine
关键词 核电 末级隔板 疏水槽 疏水孔 难点 制造 nuclear turbine last stage diaphragm drain tank drainage hole difficulty manufacturing
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部