高层建筑非标准层及变截面结构的爬模施工研究 被引量:7

Study on Climbing Formwork Construction of Nonstandard Floor and Variable Cross-Section Structure in High-Rise Building
下载PDF
导出
摘要 结合超高层建筑施工中非标准层与变截面的施工,通过方案优化,采取针对性的措施,解决了因结构变化带来的施工难题。实践证明,针对性的技术措施及施工工序优化,缩短了工期,保证了进度,可为类似工程提供借鉴。 In combination with the construction of non-standard floor and variable cross-section climbing formwork in super high-rise buildings, and through optimization of construction scheme and adoption of targeted measures, relevant construction difficulties caused by structural changes have been solved. Practice has proved that such targeted technical measures and optimization of construction processes shorten the construction period and ensure the construction progress, which can provide references for similar projects.
作者 成禹 CHENG Yu(Shanghai Construction Group Co.,Ltd.,Shanshai 200080,China)
出处 《建筑施工》 2018年第4期557-559,共3页 Building Construction
关键词 超高层建筑 变截面 非标准层施工 液压爬模 super high-rise building variable cross-section non-standard floor construction hydraulic climbing formwork
  • 相关文献

参考文献3

二级参考文献9

共引文献8

同被引文献55

引证文献7

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部