论PPP模式在幼儿园项目运营期的风险识别

Risk Analysis on the Kindergarten Operation Using PPP Mode
下载PDF
导出
摘要 随着私营经济发展与壮大,社会公共领域逐渐放开准入限制,PPP项目得到了大规模的推广。作为准公共领域,学前教育大量采用PPP模式,受利益共同体博弈影响,PPP模式的风险开始不断显现。本文以幼儿园PPP模式为研究对象,通过实地调查法,对项目运营期可能出现的风险进行了鉴定,并从安全风险、教育风险、市场风险等方面提出了相应策略,为PPP项目有效运行提供有益借鉴。 With the rapidly growth of the economic level,the PPP mode has a large scale of application and promotion in various fields,meanwhile,the risks behind it have been appeared.This article did research on the risks identification on the kindergarten operation period through the survey method.Then the countermeasures are discussed from aspects include safe y risk,education risk and market demand risk and etc.The research in this paper provides benefit to private sector and guides the PPP mode's application in the education industry.
作者 时佳 许廷武 SHI Jia;XU Tingwu(China Agricultural University,Beijing 10083,China)
机构地区 中国农业大学
出处 《皖西学院学报》 2018年第2期66-69,共4页 Journal of West Anhui University
关键词 PPP模型 幼儿园 运营期 风险识别 PPP mode kindergarten operation period risk identification
  • 相关文献

参考文献6

二级参考文献45

  • 1周运祥,曹国华.项目融资中风险分担的优化模型分析[J].重庆大学学报(自然科学版),2005,28(10):136-138. 被引量:10
  • 2蔡迎旗.国外幼儿教育财政资金的配置类型、政策及其启示[J].上海教育科研,2006(9):12-14. 被引量:19
  • 3范小军,赵一,钟根元.基础项目融资风险的分担比例研究[J].管理工程学报,2007,21(1):98-101. 被引量:37
  • 4Jin X H, Dolo H. Interpreting risk allocation mechanism in public-private partnership projects: an empirical study in a transaction cost economics perspective[J]. 2008,26(7) :707~721.
  • 5Woodward D G. Use of sensitivity analysis in Build- Own-Operate-Transfer project evaluation[J]. Journal of Project Management, 1995,13 (4) : 239~ 246.
  • 6Li B, et al. The allocation of risk in PPP/PFI construction projects in the UK [J]. International Journal of Project Management, 2005,23 : 25 ~ 35.
  • 7Ng A, Loosemore M. Risk allocation in the private provision of public infrastructure [J]. International Journal of Project Management, 2007,25 : 66~ 76.
  • 8Abednego M P, Ogunlana S O. Good project governance forproper risk allocation in public-private partnerships in Indonesia [J]. International Journal of Project Management, 2006,24 (7) .. 622 ~ 634.
  • 9Shen L Y, Platten A, Deng X P. Role of public private partnerships to manage risks in public sector projects in Hong Kong[J]. International Journal of Project Management, 2006,24 : 587~ 594.
  • 10Roumboutsos A, Anagnostopoulos K P. Publicprivate partnership projects in Greece: Risk ranking and preferred risk allocation [J]. Construction Management and Economies, 2008, 26 (7) : 751 763.

共引文献214

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部