越南成胜项目塔吊基础软弱地基处理方案介绍

Introduction of soft foundation treatment scheme for tower crane foundation of Vietnam Thanh Thang project
下载PDF
导出
摘要 越南成胜水泥厂项目场地属于山前冲洪积地貌单元,由于软弱地基无法满足塔吊基础最低承载力要求,项目部本着节约和方便施工的原则并结合现场实际情况,确定在原料粉磨和废气处理H3/36B塔吊基础下增加PHC管桩,介绍了塔吊基础地基处理方案,该方案满足塔吊正常运行所需的基础载力。 The site of Vietnam Thanh Thang cement plant project belongs to the piedmont alluvial landforms, due to weak foundation can not meet the minimum requirements of bearing capacity of the tower crane foundation. Combined with actual situation and with saving and convenient construaction principle, project department decides to add PHC pipe pile under H3/36 B tower crane foundation of raw material grinding and exhaust gas treatment. The tower crane foundation treatment scheme is introduced, and it satisfies the basic requirements for the normal operation of the crane load.
作者 周杨 何世明 朱学伟 Zhou Yang;He Shiming;Zhu Xuewei(Sinoma Suzhou(Construction)Co.,Ltd.,Kunshan,215300,China)
出处 《水泥工程》 CAS 2018年第1期85-87,共3页 Cement Engineering
关键词 塔吊 预制桩 基础 承载力 地貌 软弱地基 管桩 tower crane prefabricated pile foundation bearing capacity landforms weak foundation pipe pile
  • 相关文献

参考文献5

二级参考文献13

  • 1JGJ79-2002.建筑地基处理技术规范[S].,2002..
  • 2JGJ94-94.建筑桩基技术规范[S].[S].,..
  • 3GB5007-2002.建筑地基基础设计规范[S].[S].,..
  • 4GB3811-83.起重机设计规范[S].[S].,..
  • 5GB5007—2002.建筑地基基础设计规范.[S].,..
  • 6(JGJ94—94).建筑桩基技术规范.[S].,1995..
  • 7(GB50010—2002).混凝土结构设计规范.[S].,..
  • 8(JGJ83—95).软土地区工程地质勘察规范.[S].,..
  • 9陈晓云.特定条件下塔吊基础设计工程应用实例汇编[M].,2003,5..
  • 10中国建筑业协会建筑机械设备管理分会.建筑施工机械管理使用与维修.中国建筑工业出版社,2004.

共引文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部