摘要 目前苏里格气田生产维修点配备应急发电机一台,生产实际中由于感性负载较多,发电机供电系统功率因数较低,无法满足实际需要,同时感应电动机投运瞬间由于启动电流较大,发电机故障频繁。本文通过电容补偿的方法,目的在于提高发电机功率因数,改善供电电网质量。 The production and maintenance point in Sulige gas field is equipped with an emergency generator. In actual production,the power supply system fails to meet the actual needs due to more inductive load and low power factor of the generator power supply system. At the same time, the large starting current of the induction motor has caused frequent fault of the generator.This paper describes the application of capacitance compensation to improve the power factor of the generator and improve the quality of the power supply network.
作者 刘锐 刘晨烨 孙彧 Liu Rui;Liu Chenye;Sun Yu(Xi'an Shiyou University,Xi'an 710065,China)
机构地区 西安石油大学
出处 《石化技术》 CAS 2018年第6期99-100,共2页 Petrochemical Industry Technology
关键词 感性负载 电容补偿 功率因数 inductive load capacitance compensation power factor
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部