期刊文献+

前置策略在超高层住宅批量精装中的应用实践 被引量:3

Application of Pre-Strategy in Batch Finishing of Super High Rise Residential Building
下载PDF
导出
摘要 文章结合武汉市汉阳区中铁·世纪金桥超高层住宅项目批量精装的案例,介绍了传统批量精装修存在的问题,即在实施过程中低效、费力、不经济等缺陷。对传统批量精装修和精装方案前置进行比较,在案例中引入前置策略的应用,解决了传统批量精装中的不足。对精装前置应用中应注意的问题进行讨论。该研究适应了新形势建筑市场对精装工程的要求,为房地产开发公司实施批量精装项目提供了经济有效的方法和途径。 Combined with the case of batch finishing of ultra high rise residential buildings project(golden bridge of the central iron century of Hanyang District in Wuhan),the author discussed the problems in traditional batch finishing,it had the defects such as inefficiency,need or use greateffort,diseconomy. The traditional batch finishing and pre-strategy finishing were compared in thisarticle. Then the author introduced the pre-strategy application into the real case,to solve the disadvantages of traditional batch finishing,and discussed the problems that need to pay attention onapplication of pre-strategy finishing. The application adapted to the situation of building market of finefinishing project,it provided an economical and effective way for real estate development companies to implement finishing projects.
作者 徐畅 XU Chang(China Railway Major Bridge Engineering Group Wuhan Real Estate Development Co. , Ltd., Wuhan 430056, Hubei, China)
出处 《江汉大学学报(自然科学版)》 2018年第4期363-367,共5页 Journal of Jianghan University:Natural Science Edition
关键词 前置策略 批量精装 建筑设计 pre-strategy batch finishing construction design
  • 相关文献

参考文献3

二级参考文献5

共引文献16

同被引文献13

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部