摘要
就预测资源量(334)的地质可靠程度而言,大致划分为三种情况。一是仅施工过稀疏的探矿工程,结合地质背景、地球化学等特征圈定矿体后,估算的资源量;二是探矿工程达不到推断的工程网度要求,而从推断的资源量降级而来;三是按照推断的探矿工程网度施工,进行有限外推或无限外推后估算的资源量。上述三种类型,前者不进行备案,而后两者应该进行备案。
As to the geological reliability of prognosis resource reserves (334), it can be divided roughly into 3 types. 1. Reserves assessed on the outlined orebody according to the sparse exploration engineering, in combination with the geological background, geochemical charateristics, etc; 2. It is resulted from the degra- dation of the inferred resource reserv-es, the exploration engineering can't meet the exploration grid requirement; 3. The resource reserves assessed by limit or unlimited expolation according to the exploration engineering grid. The first one isn't registrable, the 2 and 3 must be registered.
作者
刘燕梅
余海燕
杨照河
尹留青
LIU Yan-mei;YU Hai-yan;YANG Zhao-he;YIN Liu-qing(Nujiang Bureau of Land Resources,Nujiang 673100;Yunnan International Mining Company(Ltd),Yunnan Geology and Mineral Resources,Kunming 650051)
出处
《云南地质》
2018年第3期387-389,共3页
Yunnan Geology
关键词
预测资源量
探矿工程
工程网度
处理建议
Prognosis Resource Reserves
Exploration Engineering
Engineering Grid
Treat Suggestion