摘要
细阐述了浙江国华浙能发电有限公司4号机组脱硫系统运行优化研究项目试验过程、数据分析和结果总结,研究了工艺优化、脱硫运行经济性改善和脱硫自动系统优化等,并介绍了部分成果应用于运行实践的效果和经济效益。
The test process , data analysis and result summary of the desulfurization system operation optimiza-tion project for Unit 4 of Zhejiang Guohua Zheoneng Power Generation Co. , Ltd. are elaborated. The optimiza-tion of the process , the economic improvement of the desulfurization operation , and the optimization of the des-ulfurization automatic system are studied,and some of them are introduced. Results are applied to the effec-tiveness and economic benefits of operational practices
出处
《电力科技与环保》
2018年第4期37-40,共4页
Electric Power Technology and Environmental Protection
关键词
脱硫
运行优化
研究
desulfurization
operation optimization
research