综采工作面过受断层影响探水巷实践 被引量:1

Practice on the Affected by the Fault Exploration Roadway of Fully Mechanized Working Face
下载PDF
导出
摘要 为了确保铺龙湾矿4205工作面顺利安全通过受断层影响的探水巷T3,在分析了探水巷T3与工作面层位关系的基础上,制定了安全过探水巷的方案,并辅以必要的安全辅助措施,成功地保障了工作面快速推过该探水巷,为矿井过该类型老巷尤其是探水巷奠定了基础。 In order to ensure that the Longwan mine 4205 working face successfully through the affected by the fault exploration roadway T3,based on the analysis of the exploration of roadway and working face T3 layer relationship, established safe exploration roadway plan, safe and necessary auxiliary measures, to ensure the success of working face quickly pushed through the exploration roadway, laid the foundation for the type of mine roadway especially exploration roadway.
作者 刘谋珍 Liu Mouzhen(Shanxi Pulongwan Coal Industry Co.Ltd. , Datong Shanxi 03710)
出处 《煤矿现代化》 2018年第6期176-177,180,共3页 Coal Mine Modernization
关键词 断层 探水巷 层位关系 方案 辅助措施 fault exploration roadway hierarchical relations scheme auxiliary measures
  • 相关文献

参考文献4

二级参考文献11

共引文献23

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部