期刊文献+

山谷内充填矸石覆土后土体稳定性研究 被引量:1

Study on stability of post-filling Gangue hill in Valley
下载PDF
导出
摘要 本文以山谷内充填矸石覆土后的复垦区域为研究对象,通过NTS-332R型全站仪对三条测线的土体变形进行观测,由观测结果可知:复垦后的矸石山在前150d变形较大,由边坡向复垦区内部变形逐渐减小,整体来看,复垦后的矸石山稳定性良好。 This paper takes the reclaimed area of the valley filled with gangue as the research object, through the observation of the soil deformation of three lines by the NTS-332 R-type Total station, it can be seen from the observation results that the Gangue Hill after reclamation has a large deformation in the first 150 d and gradually decreases from the slope to the reclamation area, and as a whole, The Gangue Hill after reclamation has good stability.
作者 潘晋宝 Pan Jinbao(Shanxi Xishan JinXing energy co., LTD Xiegou Mine , Shanxi Xingxian 03360)
出处 《煤矿现代化》 2018年第6期187-189,192,共4页 Coal Mine Modernization
关键词 矸石山 复垦 全站仪 变形观测 稳定性 Gangue Mountain Reclamation total station instrument deformation observation stability
  • 相关文献

参考文献5

二级参考文献74

共引文献58

同被引文献14

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部