摘要
随着城市化进程的不断加快,为人们提供了更为便捷的生活及出行方式,但也正是由于各种车辆数量的不断增长,使得城市污染问题越发严重,不利于城市的绿色发展。当前,节能环保已然成为现代社会发展的重要主题,构建节约型社会,是每个公民不遗余力的责任与义务。以此为基础,城市慢行交通系统逐步发展起来,其中,共享单车的投入使用,受到了投资者的广泛青睐,各大企业均向各大城市投放共享单车,且投放数量不断增加,这在很大程度上满足了城市市民的便捷出行要求,但也由于各种因素的影响,使得共享单车安全、停放等问题频发,由此对共享单车企业运营管理平台提出了更高的要求。在此次研究中,就城市化"共享单车"的运营现状进行分析,探究更为科学而合理的运营管理体系,从而让"共享单车"运营逐步走向正规化、规范化,从而推动城市慢行交通的发展。
With the accelerating process of urbanization,people are provided with more convenient ways of life and travel.However,due to the continuous increase in the number of various vehicles,the problem of urban pollution is becoming more serious,which is not conducive to the green development of the city. At present,energy conservation and environmental protection have become important topics in the development of modern society. Building a conservation-minded society is a responsibility and an obligation that every citizen spares no effort. Based on this,the city's slow traffic system has gradually developed.Among them,the use of shared bicycles has been widely favored by investors. Major companies have launched shared bicycles to major cities,and the number of vehicles has been increasing,which is very large. To a certain extent,it meets the requirements of the city's citizens for convenient travel,but due to the influence of various factors,problems such as the safety and parking issues of shared bicycles frequently occurred,which raises higher requirements for the operating management platform of shared bicycle companies. In this study,we analyzed the current status of urbanized"shared bicycles"and explored a more scientific and rational operation management system,so that "shared bicycles"operations gradually become more standardized and standardized,thereby promoting the development of the slow traffic in the city.
作者
温祝英
WEN Zhu-ying(Guangdong Women's Vocational and Technical College,Guangzhou Guangdong 511450,China)
基金
2017年广东省广州市哲学社会科学发展"十三五"规划课题项目"城市化背景下全民健身的可持续发展研究--以广州共享单车为例"(项目编号:2017G2GJ82)
关键词
城市化
“共享单车”
运营管理
问题
urbanization
"shared bicycles"
operation management
problems