摘要 通过解决施工基坑肥槽狭小无法进行双面支设模板施工的环境,同时解决地下室外墙层高超高大于10m以上。采用地下室外墙液压爬升单侧支模体系,满足了施工进度需要,确保了施工安全,并且混凝土成型良好,具有良好的推广性和借鉴性。 By solving the problem that the construction of the foundation pit trough is too small to carry out the construction of the double-sided support formwork construction, the height of the underground outdoor wall layer will be higher than l Om. The underground climbing-outside wall hydraulic climbing single-side support mold system meets the construction progress requirements, ensures the construction safety, and the concrete is well formed, with good promotion and reference.
作者 李旭 LI Xu(China Railway Construction Group Co.,Ltd.,100040,Beijing,China)
出处 《建筑技术》 2018年第8期901-903,共3页 Architecture Technology
关键词 液压爬升 单侧支模 外防内贴 支撑体系 hydraulic climbing single-side mold outside def-irmer patch support system
  • 相关文献

同被引文献2

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部