期刊文献+

水泥厂余热发电设备安装调试易产生的问题与对策研究

The Common Problems in the Installation and Debugging of the Waste Heat Power Generation Equipment of Cement Plant and the Countermeasures
下载PDF
导出
摘要 对水泥厂余热发电设备安装调试易产生的问题与对策进行研究,通过对水泥厂余热发电设备进行概述,进而对设备安装调试中易产生的问题提出相对应的解决策略。旨在对水泥厂余热发电设备安装调试中易产生的问题提出参考性建议,促进水泥厂的经济效益与整体发展。 This paper analyzes the common problems in the installation and debugging of the waste heat power generation equipment of cement plant and the countermeasures, reviews the waste heat power generation equipment of cement plant, and puts the solution strategy according to the problems existing in installation and debugging of the equipment. The purpose of this paper is to make some suggestions on the problems that may easily arise in the installation and commissioning of waste heat power generation equipment in cement plants so as to promote the economic benefits and overall development of cement plants.
作者 李素玉 LI Su-yu(Guangxi Yufeng Group Cement Co.Ltd,Liuzhou 545000,China)
出处 《工程建设与设计》 2018年第16期139-140,共2页 Construction & Design for Engineering
关键词 水泥厂 余热发电设备 安装调试 cement plant waste heat power generation equipment installation and commissioning
  • 相关文献

二级参考文献6

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部