摘要 通过对新疆SETH水利枢纽工程的施工导流方案设计的详细论述,从导流标准、导流流量、导流泄水建筑物、施工总工期及导流工程投资等几个方面,详细对比分析了隧洞导流方案和河床分期导流方案两种导流方式,最后推荐河床分期导流方案作为工程的推荐导流方案,并详细论述了枢纽工程导流洪水标准、导流程序及导流建筑物设计. A detailed description of construction diversion of SETH Hydro-junction in Xinjiang is presented in this paper. A staged diversion scheme is recommended for the project based on detailed comparisons between the tunnel diversion scheme and the staged diversion scheme from the aspects of diversion standard,the design flood,release structures,total construction time and total investment of the diversion works. Detailed discussions on the design flood of the hydro-juction,diversion procedures,as well as the design of the diversion works are given as the recommended scheme.
作者 蒋小健 蒋小军 JIANG Xiao-jian1, JIANG Xiao-jun2(1. Altay Administrative Agency of SETH Reservoir, Ahay 836500, China; 2. Fuyun Water Conservancy Bureau, Fuyun 836100, Chin)
出处 《浙江水利水电学院学报》 2018年第4期13-17,23,共6页 Journal of Zhejiang University of Water Resources and Electric Power
关键词 水利枢纽 导流 设计 hydro-junction construction diversion design
  • 相关文献

参考文献4

二级参考文献22

共引文献24

同被引文献13

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部