摘要
采用ANSYS对浅埋暗挖法施工过程模拟,结果表明:开挖进尺对下方既有地铁结构位移(上浮)影响较大,应选择短台阶、小开挖进尺进行穿越。最大变形均处于隧道上穿地铁交叠处,横向变形趋势向着穿越工程前进的方向倾斜移动。
Using ANSYS to simulate the construction process of the shallow tunneling method, analyze subway tunnel structure deformation law when shallow- tunneling acting on it. The results show: the maxinmnl deformation show- in the overlap belween shallow tunneling and existing subway. The existing subway structure lateral deformation is not large, lateral deformation trend toward cross the excavation direction.
作者
李海鹏
Li Haipeng(Zhongrong Planning and Design Co.,Ltd,Changsha 410219,China)
出处
《山西建筑》
2018年第23期181-182,共2页
Shanxi Architecture